Astra Management
888 - 3 Street SW, 10th Floor Bankers Hall, West Tower T2P5C5 Calgary, AB, Canada
Category
General Information
Locality: Calgary, Alberta
Phone: +1 403-796-3559
Address: 888 - 3 Street SW, 10th Floor Bankers Hall, West Tower T2P5C5 Calgary, AB, Canada
Website: www.astra-management.ca
Likes: 1055
Reviews
Facebook Blog
The perfect location for your new salon DOES exist! Imagine having a space where 17,000 vehicles pass by daily. The Lincoln on 11th Ave offers exactly that. It's time to take that step you've been thinking of, opportunities like this don't come along often.... http://astra-group.ca/beauty-hub-yyc/ #yycsalon #yycspa #yycstylist #YYChairstylist
If your dream is to open a salon of your very own, now is the time to do it! With competitive rates, tenant improvement allowance and this kind of visual street side exposure, why wouldn't you jump at the chance? Want to take a look yourself? Give our office a call and let's make that happen before it is snapped up. (403) 770-6463... http://astra-group.ca/beauty-hub-yyc/ #yycsalon #yycstylist #yychairstylist #yycspa
Thank you Calgary! Astra Group has been Crowned Top Choice Award Winner for Top Choice Commercial Renovations in the 2020 Top Choice Award Survey. We at Astra Group would like to thank you for voting us your Top Choice of 2020 and we trust to always have your support.... Cheers to a great year ahead! Sincerely, Astra Team
ALBERTA BALLET RENOVATION Area: 5,000 Sq. Ft. Duration: 1.5 Months Year of Completion: 2019... Project Description: A full interior demolition of the site started this project for the Alberta Ballet office. The demolition was extensive; ranging from flooring to walls, electrical, plumbing and parts of the ceiling. The new electrical and plumbing infrastructure we built was followed by framing, drywall and paint. Luxury vinyl tile was selected by the client and installed, along with new vanities, ceiling tile and lighting. In addition, Astra built a new IT room, ran all necessary data cables, installed new kitchen appliances, bathroom vanities and TVs throughout the site. Alberta Ballet was very pleased with our quality of work, and equally impressed with the quick timeline in which we completed the full commercial renovation. See More: https://astra-management.ca/renovations
Astra Group is proud to announce that we are an Official 2020 Top Choice Award Nominee! Vote for us here: https://www.topchoiceawards.com/vote?query=astra%20group... Please leave a "Voted" comment below so we can thank you personally!
The #renovation’s features included glass partitions and an #open-concept design. Work was completed after hours to minimize impact on other #building tenants. #Astra #Alberta #Calgary
#ASTRA #Construction renovated the ninth floor of #Calgary House. The project included complete demolition of all interior partitions, asbestos abatement, #replacement of ceiling tiles, new flooring, and new #electrical. #Alberta #mouldcleanup #renovation #construction
Work included the combination and separation of different spaces, new kitchens with granite countertops, glass-wall partitions, all-new finishes, and modifications to HVAC systems. #Astra #Calgary #Alberta #ASTRAmanagement #restoration #construction #services #installbikeracks
This project included the complete renovation of offices located on three separate floors with blueprints prepared by #ASTRA #Construction, which ASTRA submitted to the city for permits. #Calgary #Alberta
The project included custom build-outs, vinyl wall paper, architectural glass, LED light fixtures, quartz countertops, stainless-steel partitions, mosaic tiles, and flat ceilings. Most work was completed after hours to minimize impact on other tenants.
#ASTRA #Construction completed the full renovations of fourth-floor washrooms and lobby. The scope of work included the complete demolition of all #interior finishes and full remodelling, as per designs and plans by Erin Baugh. #Calgary #Alberta
The #renovation’s features included glass partitions and an open-concept #design. Work was completed after hours to minimize impact on other building tenants. #Astra #Calgary #Alberta #mouldcleanup #asbestos #abatement
#ASTRA #Construction completed complete commercial #renovations of the fourteenth floor for Versett. #Calgary #Alberta #interior #exterior #quality #renovation #service #propety
#ASTRA #Construction provided cost-saving alternatives to the design, resulting in 12% savings on the total project. Most work was carried out after hours to minimize impact on other tenants. #Calgary #Alberta
#ASTRA #Construction completed commercial renovations of locker-rooms and bathrooms. The scope of work included the complete interior demolition and installation of new finishes, large-format mirrors, ceramic tile, quartz countertops, and other. #Calgary #Alberta
New #features included quartz countertops, percaline tile, concealed sprinkle heads, and #LED pot lights. Work was completed after hours to minimize impact on other tenants. #Astra #Calgary #Alberta
#ASTRA #Construction completed the commercial renovation of washrooms in #Calgary Tower. The project included the complete #demolition and #replacement of all interior finishes as per designs.
With property damage, you have enough to worry aboutleave the #restoration to us. We document each stage of our #property-damage restoration service to confirm all damage has been addressed and fixed and that our #systematic cleaning process has been exactly followed. #Astra
Are you tired of boring interiors? Do you need a new #repair in your house or in the office? We are including different types of constuction job. Impossible is nothig with #Astra #Construction Management! #interior #exterior #quality #renovation #service #propety
#ASTRA Restorations completed #asbestos-abatement #services of floor mastic for Govan Brown. This work included the abatement of two floors of office space. Low-to-moderate-risk procedures and complete containment were necessary to complete the scope of work. ASTRA’s certified #hygienist generated #air-monitoring and #clearance reports to ensure proper abatement procedures. Work was completed afterhours to minimize public risk. #ASTRA #restorations #property #ASTRAmanagement #mouldcleanup #asbestos #abatement #renovation #construction #quality
Popular Listings
AJ's Electrical Service & Repair
#8-7157 Honeyman St V4G 1E2 Delta, BC, Canada
+1 604-946-8946
Contractor, Home improvement, Electrician
Jens nielsen construction
+1 604-551-0310
Contractor, Businesses, Local service, Home improvement
R & K Contracting Services
9847 Stephenson Rd V0B 1M5 Fernie, BC, Canada
+1 250-423-1964
Contractor, Home improvement, Construction company, Demolition & excavation company