B. Pearson Contracting
Category
General Information
Phone: +1 705-930-2159
Likes: 156
Reviews
Facebook Blog
Testing the back out this week. Will know by next when I’m back at er people. So sorry for the delay!!
I’m so very sorry I haven’t answered any messages here lately. Trying to get over a pretty bad back injury and it’s taking a lot longer than I expected.....
Testing the back out this week. Will know by next when Im back at er people. So sorry for the delay!!
Im so very sorry I havent answered any messages here lately. Trying to get over a pretty bad back injury and its taking a lot longer than I expected.....
Reclaimed maple made from a pile of reclaimed flooring
3000 pine and 2 pine staircases
Ste. Annes Grafton
Sorry I havent added anything new here lately. Its been crazy busy! Will dump some pictures off my camera here in the next week or so! Keep busy and try to enjoy this summer around the rain!!
Crazy hallway install. No reducers. All boards bevelled to carpet and tile
Did a handrail, spindles and newall posts to match the floor.
Sanding "extreamly" hard Vintage maple prefinished floor. Check out how many passes to clean off a row with my 7.5hp sander!
Install,repair, sand, stain, finish floor, staircase and bannister
Refinished the full staircase. Stringers, risors, treads, newall posts, railing and spindals. Stained to match prefinished floor.
Leveling and repairing painted pine
Call or text for questions or to book an estimte at: 17059302159 Email:[email protected] Many more pics at:b.pearsoncontracting on Instagram
Repaired an old pine floor with new wood. Stained the new wood to match the floor that was going natural. This was awhile ago unfortunatly I dont have a finish pic as another guy put the finish coats on while I was on another job.
Stained stairs to match prefinished floor
Big Brazillian cherry job I did with Alex Rathburn and Dylan John
Refinished the Higgins showroom, when I worked there years ago, Did it with Alex Rathburn
Lots of cabinets!
Painted lines on court at a school in Oshawa
Kind of a neat job. House was built off the side of a rock
Kitchen floor was beat, so painted it. Refinished rest of rooms. (Red oak/pine) Some good ol machine maintenence too!
Handrail refinished and stained to match floor.
Large prefinished install. Beveled boarder to match tile height. Will be finished tomorrow.
Laminate install
Installing laminate
Walls removed from prefinished. Removed some flooring to stagger in and join rooms together.
Floor was sanded straight across the grain. We fixed it though
New pine door antiqued to look barnboardish
Massive repairs on this job fully refinished
Job done in Junction with Goody Hardwood. 5" wide birch. Upper floor installed, sanded, stained and finished. Stairs refinished to match and bottom hallway staggered in from water damage. Carpet removed from rooms, floor laid and done to match upstairs. Handrails done to match aswell.