1. Home /
  2. Contractor /
  3. Calla Lily Construction Incorporated


Category

General Information

Phone: +1 306-536-7083



Likes: 103

Reviews

Add review



Facebook Blog

Calla Lily Construction Incorporated 29.03.2021

Two concrete trucks and a semi of lumber, boy it was a busy morning yesterday, as the three all appeared at once! The sun came out and with the help of my friend Dan over at Limewood Builders we managed to get the walls poured before today’s windstorm rolled in!

Calla Lily Construction Incorporated 27.03.2021

The word ‘renovation’ can mean a LOT of different things... sometimes that’s things like paint/trim, changing windows, adding a closet, etc... In this case it’s a little more all-encompassing! Take a peek, I’ve been pretty busy completely gutting, re-enforcing, lifting/leveling, and prepping for an addition on this rather large renovation project! Check out the last picture; not everyday the concrete chute gets poked through a door into a house!

Calla Lily Construction Incorporated 16.03.2021

Sometimes the best views are from second story valley side rooftops! Look closely, that’s highway 20 next to the river down at the bottom!

Calla Lily Construction Incorporated 09.03.2021

One more quick late season trench before the snow flies!

Calla Lily Construction Incorporated 16.12.2020

What started out as a muddy, damp, dark crawlspace got all properly sealed up to keep all the pesky moisture in the dirt where it belongs instead of coming up and continuing to ruin the rest of this house.

Calla Lily Construction Incorporated 05.12.2020

Sometimes a plan just goes flawlessly, and part of a house just lays down for a nap! Stay tuned, big plans in the works for this one!

Calla Lily Construction Incorporated 20.11.2020

I have also acquired a set of 8’ high concrete wall forms! Footing up, we do it all!

Calla Lily Construction Incorporated 15.11.2020

Anyone looking to heat/power outbuildings or bin yards before the frost hits? We now do trenching as well! Give us a call today!

Calla Lily Construction Incorporated 09.11.2020

When you pickup a house that did not have a basement and put it on a full 8’ basement, you need to invent a place to put stairs! Check out the video in the comments of me lifting the second floor from the basement!

Calla Lily Construction Incorporated 30.10.2020

Check out this cool exposed lumber staircase I built! Obviously it still needs light sanding and stain/clear coat but that can wait until all the trades are done running up and down it wearing boots!

Calla Lily Construction Incorporated 26.10.2020

This re-roof turned out beautifully and should keep the homeowner warm and dry for years to come! As almost always with re-roofing a heated building, we added some venting to ensure this roof stays problem free in our wide variety of Saskatchewan climate conditions!

Calla Lily Construction Incorporated 23.10.2020

Have a peek inside this massive house renovation now that the kitchen is nearly complete! Yes this is the same house I relocated the stairs in, stay tuned for further updates!

Calla Lily Construction Incorporated 10.10.2020

Shingles starting to fail? Call today to have your roof redone before fall!

Calla Lily Construction Incorporated 26.09.2020

Finished this reno for Calla lily construction. Drywall and prime! Ready for some final colour! Message us today for your spring projects.... Calla Lily Construction Incorporated

Calla Lily Construction Incorporated 18.09.2020

So here’s a really cool little loft I managed to get a start on before all this pandemic stuff! Tongue and groove pine, exposed truss vaulted ceiling! Gonna be one cool teenage hangout!

Calla Lily Construction Incorporated 29.08.2020

Need a fireplace? I can do that!

Calla Lily Construction Incorporated 24.08.2020

Some days you just start out on the roof and find yourself in the basement!

Calla Lily Construction Incorporated 17.08.2020

There once was a kitchen, until I got my hands on this house.... I turned the stairs 90 degrees, patched the hole, shortened and added to the staircase, removed many walls, replaced a section of wall, deleted a chimney, and prepped for the brand new kitchen!

Calla Lily Construction Incorporated 13.08.2020

Just a quick 3 day remove and replace siding!

Calla Lily Construction Incorporated 05.08.2020

These poor old cedar shakes needed a waterproof replacement that would last as long as they did... once the wind dies down we can get back up there and finish her off!

Calla Lily Construction Incorporated 03.08.2020

So this lovely couple had been arriving back at the farm to this nice White House for 40 years before they decided on a colour change and siding upgrade!

Calla Lily Construction Incorporated 23.07.2020

Here’s some sneak peeks of the upstairs bedrooms!

Calla Lily Construction Incorporated 10.07.2020

Finished off the inside of the public gazebo here at Alice Beach, ready to be used all summer long!

Calla Lily Construction Incorporated 03.07.2020

Before, during, and after of the new windows/doors!