Dave JR Smith
Category
General Information
Phone: +1 250-608-2575
Likes: 29
Reviews
Facebook Blog
Dave JR Smith 13.02.2021
Some continuation of the garage. A floor layout of what things used to look like and May look like in the future.
Dave JR Smith 07.02.2021
Onto the next thing. Took down some closets and moved the hot water tank to a new spot. Got the furnace and I will start doing the venting so we can have a cheaper winter.
Dave JR Smith 20.01.2021
Finally done 3/3 of the concrete.
Dave JR Smith 10.01.2021
Finally finished
Dave JR Smith 21.12.2020
A full 160’ trench dug at about 31 deep. 1 line inside 4 big O, and electrical cord all in one trench. Organized finally