Duerr Construction Ltd.
Category
General Information
Phone: +1 416-721-2455
Website: DuerrConstruction.com/
Likes: 110
Reviews
Facebook Blog
The dump trucks spread out the stones as they drop them on the road and their tires crush everything down as they drive over the material. However, this leaves a 5 inch hump between the tire impressions, which has to be smoothed out. We rented a Cat for the week to do that.
We had 16 dump truck loads of stone delivered, 12 of which were 4 minus. This material contains stones 4 inches and smaller and therefore less likely to be driven into the dirt by traffic.
We had our right-of-way re-surfaced about 10 years ago and it needs repairs. The 800 meters have eroded enough to make it difficult to get in without a 4 wheel drive vehicle. We`ll add more stone and redo the culverts.
Now that we finished our major project in the city, we're back in Minden to finish our cottage. There are about 10 large trees down across our right-of-way. Luckily no damage to our cottage or our neighbour's.
Our project ended successfully with an over-asking sale after 3 days on the market. We "staged" the house to give potential buyers an idea of what it could look like.