1. Home /
  2. Contractor /
  3. Foress Developments


Category

General Information

Phone: +1 250-881-4261



Website: www.foressdevelopments.com

Likes: 308

Reviews

Add review



Facebook Blog

Foress Developments 28.09.2020

A feeling of satisfaction to get the occupancy certificate for 1855 Varsity Place...Only landscaping is left to be done...My clients have already moved in...Visibly happy folks...

Foress Developments 20.09.2020

Almost there...Near completion...253 Lone Oak Place...Victoria

Foress Developments 03.09.2020

Foress Developments starting another custom project for its clients...265 Lone Oak Place...The footings and the foundation walls are on for a slab on grade configuration...The proposed build would be a West coast modern home....

Foress Developments 01.09.2020

Foress Developments specializes in building West coast modern homes...2190 Navigators Rise was the first West coast modern home built by Foress Developments in the year 2015...Since then it has built more than 20 such homes in the different municipalities of Victoria...Looking to build a West coast modern home...Contact Foress Developments to build a house of your dreams...

Foress Developments 24.08.2020

Pouring for the Foundation walls at 800 Jasmine Avenue...This Concrete pumping truck from Radix has a phenomenal reach...

Foress Developments 15.08.2020

A lot of hard work and planning goes in to put all the elements together in such kind of complex custom build. The whole envelope of the lot had mother rock underneath and had to be blasted 14 feet to put the foundation for the basements; both for the main house and the accessory building. Now this project at 1855 Varsity Place is getting ready to be finished in a couple of weeks.

Foress Developments 03.08.2020

The trademark of any residential construction project undertaken by Foress Developments is on the quality of the build. Every project of Foress Developments is a class on itself; a testimony to the commitment for excellence. Sharing the interior pictures of a recently completed project.

Foress Developments 27.07.2020

Tall Foundation walls for the project at 800 Jasmine Avenue...Coming along...Regular Foundation walls are for the Accessory building in the back...

Foress Developments 20.07.2020

Patio pavers being laid at 1855 Varsity Place...

Foress Developments 06.07.2020

New potential site for development...

Foress Developments 24.06.2020

Footings poured at 800 Jasmine Avenue...

Foress Developments 19.06.2020

Foress Developments has its own cabinetry division...we specialize in all kinds of cabinets...Wood, Laminate, Acrylic...from Modern to traditional designs... Cabinet installation is underway for one of our custom build project at 1855 Varsity Place...the cabinets in the video are just for the Kitchen, Living and Dining areas...

Foress Developments 03.06.2020

Latest Project by Foress Developments

Foress Developments 30.05.2020

Floating treads in the staircase of a modern home built by Foress Developments brings an extra dimension in the overall interior finish of the dwelling.

Foress Developments 15.05.2020

Excavation complete at 800 Jasmine Avenue...Site ready for footings this week...

Foress Developments 25.04.2020

Let Foress Developments build a house of your dreams. Honesty, integrity, transparency is our motto. We have the expertise to build the custom house; from the traditional to the modern design to tailor your needs. The latest completed project for a custom West Coast Contemporary Modern house at 3405 Veterans Street, Victoria for our esteemed clients.

Foress Developments 15.04.2020

3405 Veterans Street...Building part 100% complete...Ready for possession...Last part of landscaping left...Sod to go in tomorrow...Landscaping design, selection of plants and trees along with the execution of landscaping...done by Foress Developments...This saves a lot of money for our clients...Another advantage of using Foress Developments to build a custom home of your dream....

Foress Developments 30.03.2020

Aerial view of the excavation at 800 Jasmine Avenue....

Foress Developments 10.03.2020

Excavation in progress at 800 Jasmine Avenue for the construction of a new dwelling...The digging has to go more than 11 feet deep from the main floor elevation to house a basement...

Foress Developments 04.03.2020

Excavation starts at 800 Jasmine Avenue...

Foress Developments 16.02.2020

The existing dwelling being demolished to pave the way for a new home at 800 Jasmine Avenue, Victoria...

Foress Developments 20.01.2020

Operating Construction Sites During COVID-19: BC Government Update and Guidance: There should be no more than 50 people in the same space in any circumstances. Where possible, employees should maintain a distance of two meters apart from each other.... Post signage that limits the number of occupants in any elevator to four people at a time. Reduce in-person meetings and other gatherings and hold site meetings in open spaces or outside. Increase the number of handwashing stations and post signage that identifies their location. Maintain a list of employees that are currently working on sites and update this list daily. All common areas and surfaces should be cleaned at the end of each day. Examples include washrooms, shared offices, common tables, desks, light switches, and door handles. Anyone with COVID-19-like symptoms, such as sore throat, fever, sneezing or coughing, must self-isolate at home for 14 days. Section 4.85 of the Occupational Health and Safety Regulation does provide for a minimum standard around the provision of washrooms and handwashing facilities. Where plumbed facilities are impracticable, employers must provide access to portable washroom and hand-washing facilities. Those facilities must be maintained in good working order and must be provided with the supplies necessary for their use.

Foress Developments 17.01.2020

3405 Veterans Street, Victoria....Westcoast Modern Home...Almost there...Waiting for a spell of good weather to finish the exterior painting and landscaping...

Foress Developments 01.01.2020

Footings and Foundation walls being poured at 253 Lone Oak Place....

Foress Developments 26.12.2019

Foress Developments Inc. has started a new custom project for its clients at 253 Lone Oak Place in Victoria. The custom project is a 3400 square feet Westcoast Modern home. It promises to be an exciting build.

Foress Developments 13.12.2019

534 Gurunank....Coming along...

Foress Developments 01.12.2019

Foress Developments starting a new construction project at 800 Jasmine Avenue for its clients... The existing house and the shed on the property to be demolished and a new Westcoast Modern home to be constructed in its place...

Foress Developments 19.11.2019

Attending a 2 day LEEP Technical Forum 2020, organized by Canadian Home Builders Association in Victoria, January 27 & 28, 2020...

Foress Developments 02.11.2019

Footings and Foundation pour at 4238 Hayden Court...

Foress Developments 21.10.2019

Pouring tall foundation walls at 534 Gurunank...A lot of concrete would go in...with Darrell Ell

Foress Developments 14.10.2019

1855 Varsity Place...Coming along...

Foress Developments 05.10.2019

From January 1, 2020, many municipalities in Victoria have announced that the new builds would be assessed under BC Energy Step Code-3. It is a big jump from BC Energy Step Code-1 that is currently being employed for assessment for any building permit. BC Energy Step Code-3 is aimed to provide better and energy-efficient homes. There is a lot of confusion out there in the construction industry about the changes that would have to be carried out to achieve the energy efficien...cy in BC Energy Step Code-3. Foress Developments Inc. has all the expertise and the knowledge to ensure that the desired efficiency is achieved as mandated by the BC Energy Step Code-3. If you are planning to build a house of your dreams and looking for an experienced builder then you can rely on the vast experience of Foress Developments Inc. has in the construction industry; from designing the house to the final completion, as per the prevailing codes and standards in the construction industry. See more

Foress Developments 28.09.2019

The year 2019 has practically come to an end, as far as the construction activity is concerned. It would be the last working day for most of the trades, suppliers, designers, engineers, and many others involved in the construction industry. Foress Developments Inc. wishes all its clients, suppliers and trades Happy Holidays and a Merry Xmas.

Foress Developments 24.09.2019

Sheer Elegance by Foress Developments....

Foress Developments 16.09.2019

Class work by Foress Developments Inc.

Foress Developments 02.09.2019

The best way to install a wood floor is to glue it down...Floating wood floor or even a nail down wood floor can bring some creaking issues later on....Engineered wood floor being installed at 3405 Veterans Street...

Foress Developments 24.08.2019

Custom build at 3405 Veterans Street coming along nicely...A top quality home all the way...A stamp of class by Foress Developments...