The Glen Robinson Mill
Category
General Information
Phone: +1 778-214-8842
Likes: 77
Reviews
Facebook Blog
The Glen Robinson Mill 15.01.2021
Some ship-lap we milled and installed in the main cabin at Glen Robinson.
The Glen Robinson Mill 03.01.2021
Today we framed in the door and the front loft. For the loft, the cross beam and trusses are all live edge pine.
The Glen Robinson Mill 20.12.2020
Today Jeff and I got up all the walls by dark. 3 1/2 x 3 1/2 posts for studs at 2 foot centres.
The Glen Robinson Mill 01.12.2020
1X8 Fir flooring for a the new cabin is done. Ready to check for square, trim and start framing the walls!
The Glen Robinson Mill 13.11.2020
All the lumber is milled and the new cabin is rising in time to beat the snow! Need material for a project? Let us know