Golden Ears Airpark 03.06.2021

We’ve now started the concrete and landscaping that will make up the main entry. This will include two, 12 foot electronic gates. One for entry. One for exit. They’ll be surrounded by sandblasted concrete planters and gardens and the perimeter will be aluminum black picket fencing. Extensive trees and shrubs will compliment the boarder and three, 30 foot aluminum flag poles will fly out countries flags high and proud. All of this and more will be complete, and ready to use once building C is complete early this summer.

Golden Ears Airpark 16.05.2021

Things are coming along quite quickly now. The trusses are about 30% complete and the roof is starting next week. Come summer this building will be busy with pilots coming and going. How time flies. We’re 70% sold out on the first building, building C, and are now starting to sell the second building. Building D. Three units are already sold in Building D. Stop by at site and get in on the experience. YPK is the place to be..... Cheers and stay safe.

Golden Ears Airpark 26.04.2021

As the sun comes up on another day. What I mean is As the sun comes up on another day after another all nighter pouring and finishing concrete. Yes what started at 9 am one day, ended at 9am the next day. Well worth the effort. The entire building slab is now poured. We’re now well into the framing stages. Roof trusses come next week. Count down to summer and home to many happy buyers. If you want in, time is running out. Only 2 T Hangars left and 3 box hangars. Come see us on site. 11807 Baynes Road. Cheers and stay safe.

Golden Ears Airpark 22.04.2021

What a difference a day makes....how many times have you heard that? No worries..... if you live on the west coast its just another day. A good day to play with big man toys and move some dirt. A whole lot of dirt. This spring we'll be selling screened topsoil so if you need some come on by and buy. We have about 1,000 truck loads. Anyways, back to the good stuff. This Tuesday we pour the remainder of Building C concrete and then we can finish the framing. Onward we go. We're 80% sold in this building which will be complete this summer so if you want a hangar, and quick, stop by. Cheers and stay safe.

Golden Ears Airpark 11.04.2021

This is a HUGE STEP. The framing has begun and the end of June comes ever closer. This summer aircraft of all shapes, sizes, and makes will come and go from the first building (Building C) of The GoldenEars Airpark. The trusses arrive next week. The site is getting prepped to begin bringing in fill once again. Things are hopping. This is the place to be. Come join us... be a part of the BUZZ. Call this home for your baby... see you soon.. stay safe.

Golden Ears Airpark 11.01.2021

So I arrived at work Thursday Jan 21 at 4:00 AM. The pump trucks arrived at 5;30 and the first concrete truck rolled in at 6:55AM and it all started. Under the bright flood lights and cool temperatures the first load of concrete landed in the forms. It would go on to be a beautiful west coast sunny winter day which allowed everyone to be in good spirits and after 11 hours of pouring, 30 truck loads, and precisely 293 cubic metres of concrete, the last truck rolled out at 3:15.... You would think the finishing and polishing would not be far behind, well, only 1 hour later, the sun departed and the floodlights came back on. The temperatures began to drop and with that the curing of the concrete began to slow immensely. As the temperatures dropped to a balmy -3 the finishers from PSI Concrete showed their true colours. Never did they slow. Never did they complain. Never did they say we’re done. They were AMAZING. I have been in construction since February 1982 and my hats off to these guys for their unwavering efforts. So, after 25-1/2 hours, freezing cold temperatures and sleep deprivation the last finisher drove away. 8:30AM the next day. I can’t say enough about what an amazing day and night we had. I’m so proud to be a part of this development and surrounded by people that give it their all. So thank you, to PSI Placing and Finishing and Rempel Concrete supply for this day. We’re now one giant step closer to seeing airplanes come and go from the GoldenEars Airpark. Cheers, and stay safe.

Golden Ears Airpark 30.12.2020

It all comes down to this. Tomorrow’s the big day. 250 metres of concrete. First truck arrives at 6am. Just in time. Supposed to get cold all weekend. Next week, we start framing the walls. End of June is getting close. Airplanes await.

Golden Ears Airpark 15.12.2020

When we began this project it was a flood plane. All the surrounding land still is, not us. We’ve elevated the building site by over 6 feet to be high and dry eliminating any threat of water. The floor level will be 22 inches above Baynes Road. A building is only as good as its foundation. This foundation is as good as it gets by being high and dry. This is the beginning of a quality Built Aviation Hangar Development. Come see us at our sales center on site. 11807 Baynes Ro...ad. Cheers and Stay Safe......