1. Home /
  2. Industrial company /
  3. IJACK Technologies


Category

General Information

Phone: +1 306-435-4848



Website: myijack.com

Likes: 394

Reviews

Add review



Facebook Blog

IJACK Technologies 23.02.2021

According to Environment Canada, 22 cold-weather records were broken throughout AB, SK and MB this week, with -50C recorded in some places. We are cold just writing this! If you’d like a toque for this cold weather feel free to reach out to drop us a line and we will happily get one out to you. Stay warm, friends!

IJACK Technologies 18.02.2021

IJACK has partnered with our customers and national environmental programs in aligning with a global initiative to reduce emissions by eliminating the need for venting and/or flaring via our innovative solutions. With initiatives launched which encourage oil and gas producers to think green, we have customers successfully applying for grants to assist in funding, while meeting their internal corporate ESG goals. Thank you to the Canadian Trade Commissioner Service (TCS) and P...TAC for inviting and including IJACK in the directory. https://www.ptac.org/canadian-capabilities-in-methane-emis/ Contact us at [email protected] for more information on how we are reducing emissions, costs and maintenance downtime. #sustainability #ijack #oilandgas #flaring #environmental #emissionsreduction #methaneemissions #PTAC #TCS #esgfunds

IJACK Technologies 06.02.2021

We have opportunities for highly motivated and forward thinking individuals! Ideal candidates will possess knowledge of industrial equipment and hydraulics, have good communication skills and previous experience in related industry. Please e-mail resume and cover letter to [email protected].

IJACK Technologies 24.01.2021

Do you want to make oil facilities, separators, pumps, compressors and storage tanks obsolete and implement a cost effective technology for the transportation of multiphase fluids in a single pipeline direct from the well to your battery? XFER’s are doing this for our customers throughout North America at a fraction of the purchase and maintenance cost of screw pumps. We have replaced 500HP screw pump packages with 125HP XFER’s and achieved lower intake pressures, adding production. Checkout the IJACK XFER Triphase Transfer Pumps at www.myijack.com or contact us at [email protected] #ijack #multiphase #screwpump #pumpinnovation #oilandgas #oilindustry #noflare #pumptechnology #triphase

IJACK Technologies 08.01.2021

Meet Tim Beals, IJACK'S man who wears many hats! Tim has been a part of the IJACK family for three years now and is integral both behind the scenes and center stage. Heading up our Business Development, Tim works with new and existing customers in uncovering opportunities for optimization. Behind the scenes, Tim is key in taking customer feedback and working alongside our engineers to create custom solutions; managing operations and acting internally as a coach and subject matter expert for our employees. Originally from Toronto, Tim grew up in Colombia and has been a Calgarian for the past 20 years; his diverse upbringing translates into his exclusive career in Oil and Gas. When Tim isn’t working (hard to say when that actually happens), he enjoys spending time with his family.

IJACK Technologies 02.01.2021

All the best in 2021, cheers to you!

IJACK Technologies 28.12.2020

2021 is here and the IJACK crew is back hard at work. A new high temperature version of our XFER Multiphase Transfer Pump shipped today for a SAGD steam application in northern AB. We are really excited about developing this new solution for an awesome customer and are eager to see it commissioned tomorrow.

IJACK Technologies 26.12.2020

Wishing everyone a joyous 2020 holiday season, however you're celebrating!

IJACK Technologies 10.12.2020

Destination Viking: The last 2 of 4 XFER 22"series Triphase Transfer Pumps are leaving the shop for the south Viking play to be installed this week. Thank you to all our customers who trust the IJACK equipment to optimize their wells and add to the bottom line.

IJACK Technologies 06.12.2020

Do your Q1 plans include building a new Facility? Why not replace the footprint and the costs associated to group lines, separators, inter-cooled compressor stations, pump stations, booster pumps, triplex pumps, automation centers and an almost full time operator? IJACK Technologies Inc. has ready-made packages proven to replace the need to build and maintain costly Facilities.

IJACK Technologies 16.11.2020

Will a 400psi + pressure reduction increase your production? Lower your casing, well and flowline pressures individually or simultaneously. IJACK’s optimization equipment can achieve up to 740psi+ pressure reductions with low cost of ownership. Single and Triphase applications.

IJACK Technologies 12.11.2020

If you are looking for equipment to reduce your flaring / venting, IJACK Technologies Inc. provides gas compression systems which can qualify under the CanERIC program. With a strong push to 'Go Green', how are your operations aligning? https://www.nrcan.gc.ca//emissions-reduction-fund-on/23050