JwinHomes 02.03.2021

Aug2019 - Lock up Stage Framing 100% Done, Roof covered, Decks torched on, Low-E Windows and Sliding doors in, Concrete stairs poured, Plumbing radiant heat and rough-in, Electrical underground tech cable passed and interior pot lights installed, HVAC tubes in @ Vancouver, British Columbia

JwinHomes 20.02.2021

All exterior and interior framing completed.. House is taking shape

JwinHomes 18.02.2021

Jun2019 - Taking advantage of the summer months, we are progressing FAST! Foundation, Concrete Pouring, Waterproofing, Drain tiles, Basement Framing

JwinHomes 05.02.2021

May2019 - Construction Has Begun!!

JwinHomes 24.12.2020

May 2020 - Site Completed in 1 Year Final plumbing, electrical inspection pass !! Asphalt, gunmetal aluminum railings & gate installed, AC condenser and remotes in place, concrete polished, bug screens installed, Weiser touchscreen padlock, phone activated - automatic roller shade blinding, faux wood blindings installed and final site clean up

JwinHomes 25.11.2020

April 2020 - The finishing touches Final landscaping complete, interior glass railing and balcony installed, All appliances in working condition, Finishing exterior stairs installed and stained, Trex composite decking installed, Finishing low voltage (4K security cameras, alarm system) complete, Telus TV & Internet connected PS - Have you planted your fruit n veggie crops?

JwinHomes 12.11.2020

Mar 2020 - More finishing work Cabinetry doors, closets, mirrors, glass shower doors all installed, Finishing stairs installed with stainless steel bolts, Concrete sidewalk poured and finished with small river rocks, Aged composted mulch scattered, Fences stained, Appliances delivered, Custom detailed walls installed (What do you see? )

JwinHomes 09.11.2020

Feb2019- Finishing Work Quartz countertops installed and caulked, All 8’ & 7’ Doors, window casings installed using laser level, trims and baseboards installed, patched and sanded, Plumbing / HVAC finishing (Mechanical room- copper pipes, faucets, vents etc) Electrical finishing (Dining light, outside plugs etc) fence/toilet rentals returned

JwinHomes 29.10.2020

Dec 2019 - Ending the year Strong! Interior walls primed and painted, Laminate and tiles started, kitchen/bath cabinet designs finalized, fence installed, fireplace framed

JwinHomes 27.10.2020

Nov2019 - Exterior complete, interior ready for finishing!! BC Hydro, Fortis BC connections, Blower door test, Cladding complete, Window trims caulked and painted, Drywalls boarded and sanded, scaffolds dismantled