1. Home /
  2. Company /
  3. LOCO Developments


Category

General Information

Phone: +1 250-409-4535



Likes: 122

Reviews

Add review



Facebook Blog

LOCO Developments 29.01.2021

About 90 % complete on another project.. started out as a small bathroom job and then we added some flooring, then we found some mold and all the plans went away lol. I really wish we could have saved the orange carpet tho

LOCO Developments 15.01.2021

After a whole lot of framing fixing, a whole new laundry room, ripping out the stairs and fixing the wonky landing and rebuilding the stairs. Drywall in up and ready for some mud

LOCO Developments 07.01.2021

Some stuff I have been working on for the last little bit. . Lots of unexpected issues with water, mold, ants and termites on two different projects. And this is a perfect example of why you need proper materials, installed properly. Fortunately all the issues have been dealt with and its on to the fun stuff now

LOCO Developments 05.01.2021

Completed this little fence project. Plus a few extra add ons, but all it all it turned out pretty good

LOCO Developments 29.12.2020

Re built this deck, Its a good thing too because I dont think it would have lasted until spring .

LOCO Developments 06.09.2020

So I was called in to look at possibly replacing a floor that had some water damage.. Not really knowing what we were in for until we got the floor ripped up to see what we were working with. It was definitely worse than we expected.. There was wood floor glued directly to concrete and a bunch of sand on top of that for what seemed like a leveling agent.. This is why you never put wood directly on concrete, it will suck the moisture out and swell up. When it has no where to go it will buckle, not to mention the mold growth

LOCO Developments 30.08.2020

Completed this project for a fantastic client.. added a little 2 piece ensuite to a bedroom for a little easier bathroom access..

LOCO Developments 27.08.2020

I do love working with cedar.

LOCO Developments 10.08.2020

Another project completed. You definitely have to love building a deck in 35 degree weather. I got to meet some great people on this project. The railing and deck covering to be done by a different company

LOCO Developments 08.08.2020

Finished up a little bit of landscaping. Built some window wells and layed some cement patio stones.

LOCO Developments 19.07.2020

We now accept credit cards

LOCO Developments 29.06.2020

Lots of jackhammering and some rain delays but I definitely made this entrance a little more welcoming

LOCO Developments 07.06.2020

Replaced the railings and stairs. Its all safe and solid now.. Next up is the front entrance porch

LOCO Developments 25.05.2020

Finished up a large fence project. Some bushwacking and tree removal, but it all worked out and the dog will be happy.

LOCO Developments 16.05.2020

Even you could have one of these fancy lawn ornaments. Message to find out how

LOCO Developments 05.05.2020

Painting and flooring all finished up

LOCO Developments 25.04.2020

Capped the chimneys, dog proofed the deck and installed a door to a closet where there was just a curtain

LOCO Developments 18.04.2020

Just about done the painting in the flooded basement job..

LOCO Developments 29.03.2020

A neat double hinge saloon style gate

LOCO Developments 17.03.2020

Got this fence job completed. Now the doggo can enjoy the yard!! I even brought out the "regular size" guns to help with this job

LOCO Developments 14.03.2020

Bathroom fix up.. Soft walls in the shower is not something to ignore

LOCO Developments 02.03.2020

A little siding job.. love working with cedar

LOCO Developments 29.02.2020

Almost got the mudding all finished up on the flooded basement job

LOCO Developments 15.02.2020

Completed fence job. Before and after pictures. The old fence was literally falling over

LOCO Developments 12.02.2020

Helping out a client after a basement flood. Lots of fun piecing it all back together.. Staring to see some progress . More pictures to come, if I can remember to take pictures

LOCO Developments 29.01.2020

A few pictures of a job we are working on. Trim, Baseboards, Windows and installing some huge 8 doors .. Some more pictures to come if I can remember to take some

LOCO Developments 10.01.2020

Now that the winter holidays are over, its time to start thinking about upcoming projects that you might want to get completed before the summer hits! Loco is more than willing to take these on..nothing is too big or too small!

LOCO Developments 08.01.2020

Starting on the first project of the new year in our new town. T&G cedar soffits. More progress pictures to come

LOCO Developments 25.10.2019

Some progress on our first project with the new builder @ Fernie, British Columbia

LOCO Developments 17.10.2019

Some pictures of the hardie siding we installed in sparwood

LOCO Developments 06.10.2019

Forgot a few pictures of the loft

LOCO Developments 27.09.2019

Got 95% of the interior finished up at the Columbia Lake job. Turned out pretty good considering the state of the job when we took it over and started on this project. Thanks MAJA Construction Inc. for helping out

LOCO Developments 14.09.2019

Some flooring and tile pictures of a work in progress.. More pictures when the work is finished. MAJA Construction Inc.