MultiRez 28.06.2021

Siding going on and onto 2nd floor with drywall

MultiRez 25.06.2021

Here’s some picks great job to Maracle Drywall

MultiRez 18.06.2021

Well 3rd floor units drywaller and mudding in progress pics too follow

MultiRez 30.05.2021

Freeze board going on the building, drywall being installed should be ready for tenants by Oct

MultiRez 25.05.2021

Coming together

MultiRez 11.05.2021

Front of building and the soffit fascia at back

MultiRez 29.04.2021

Here’s a pic of the front of building with masonry

MultiRez 18.04.2021

Today soffit. It certainly is coming together, stone and brick also going on. Should have some nice pics by the end of next week.

MultiRez 16.04.2021

Roof sheeted despite all the snow lately

MultiRez 08.04.2021

On goes the tyvek and in go the windows

MultiRez 20.03.2021

Put all these bad boys on today

MultiRez 15.03.2021

Today’s achievements

MultiRez 09.03.2021

Put on another 110 sheets 180 total so far