Patty J Construction
Category
General Information
Phone: +1 902-897-5868
Likes: 120
Reviews
Facebook Blog
Things are getting wrapped up at the Rollo Bay job. I finished the deck last week and finished all the remaining inside stuff this week. The countertop in the 3 season room started off with a 4 foot wide by 8 foot piece of acacia and after being ripped in half, notched around the windows and joined together with biscuits we finished off the 3 season room!
Finished framing the deck and installing blocking for the handrails. Next is the #trexdecking that will be started tomorrow @ Prince Edward Island
Some white washed pine installed on the ceiling and I got a start on the ship lap on the walls in the 3 season room.
A before and after pic of the 3 season wall after some @certainteed trim boards and some @lpsmartside lap siding.
Finished framing the deck and installing blocking for the handrails. Next is the #trexdecking that will be started tomorrow @ Prince Edward Island
Some white washed pine installed on the ceiling and I got a start on the ship lap on the walls in the 3 season room.
A before and after pic of the 3 season wall after some @certainteed trim boards and some @lpsmartside lap siding.
Happy Mother’s Day to my honey. Thanks for always being there for me and our sweet little boy and supporting me as I navigate the world of running a business. Everything I do is for you and Jeppy. And a happy Mother’s Day to my mom and mother in law.