Roaron Construction 24.01.2021

Drilling and port flushing prior to injection work to stop leaking.

Roaron Construction 18.01.2021

Metro Vancouver water reservoir works. Completing access hatch sealing today. Nice to have inside jobs this time of year.

Roaron Construction 30.12.2020

Water main repair almost done. Brick pavers installation is the final step.

Roaron Construction 18.12.2020

Water main repair bedding, thrust block, backfilling and grading all complete today. Water service back on. Monday the pavers go back in.

Roaron Construction 28.11.2020

Concrete curbing repair. Reinforced by pinning and horizontal 15M bar. Hope it keeps the snowplows at bay.

Roaron Construction 22.11.2020

Wet basement vapour transmission sealing. Stopping moisture transmission through the crawl space slab to lower humidity levels.

Roaron Construction 15.11.2020

Ladner Rd bridge waterproofing using Protectowrap M400AR. An afternoon’s work.

Roaron Construction 11.11.2020

Geike Cr Bridge Tlell Haida Gwaii

Roaron Construction 02.11.2020

A cold day but a dry day for some crack sealing before the winter rains.

Roaron Construction 01.11.2020

Bridge waterproofing Yukon

Roaron Construction 14.10.2020

Haida Gwaii bridge waterproofing and paving done on Hwy 16. Sheet membrane installation.

Roaron Construction 06.10.2020

Today’s chip sealing. Sometimes an affordable short term solution to patching.

Roaron Construction 21.09.2020

GVRD water reservoir lid sealing. The people of Langley will have a rather large new water reservoir and playgrounds on the roof of it.

Roaron Construction 16.09.2020

6hr window to waterproof before rain showers. A quick hot rubber application and cover with poly before paving. Bittner Cr Bridge Fort George.

Roaron Construction 10.09.2020

Bridge waterproofing North Vancouver Bakor 790-11 hot applied asphalt rubber.

Roaron Construction 31.08.2020

Hot day and slow work. Surprise 12 thick concrete removal under the asphalt pavement.

Roaron Construction 21.08.2020

Freshly cured, ready to be stripped.

Roaron Construction 12.08.2020

Some dry nice weather. Perfect for getting some crack sealing done.

Roaron Construction 25.07.2020

Finally weather dry enough to pour some concrete today.

Roaron Construction 05.07.2020

Cold joint crushed keyway replacement with polymer grout and polyurea jointing.

Roaron Construction 20.06.2020

A hot day to put down two component traffic deck membrane system. Spec’d Masterseal 2500. Part 1 of 2