1. Home /
  2. Commercial and industrial /
  3. Tundra Environmental & Geotechnical Drilling


Category

General Information

Locality: Stettler, Alberta

Phone: +1 403-742-6601



Website: www.tundraenvirodrilling.ca

Likes: 148

Reviews

Add review



Facebook Blog

Tundra Environmental & Geotechnical Drilling 14.12.2020

Mel and Jordan with a sweet photo from this morning. Hope everyone has an awesome Friday!

Tundra Environmental & Geotechnical Drilling 02.12.2020

The Team from TUNDRA Environmental & Geotechical Drilling has arrived at Nitehawk. Tomorrow they will be starting the borehole drilling program on the Chairlift... Line to assess soil composition and ground water levels in and around the landslide area. The data collected will then be analyzed and compiled into a report by our friends at PARKLAND Geotechnical Engineering to be used to determine our best next steps forward. We want to remind Everyone that Nitehawk will be OPEN this winter with 3 out of 4 lifts still in operation...despite the chairlift not being available for this Season. We appreciate your support & understanding; and we look forward to continuing to provide outdoor recreation opportunities to the Community this Winter & Year-Round.

Tundra Environmental & Geotechnical Drilling 17.11.2020

Mel and Jordan on Rig 19 enjoying the nice fall weather.

Tundra Environmental & Geotechnical Drilling 03.11.2020

HQ coring on Steamboat Mountain, BC.

Tundra Environmental & Geotechnical Drilling 29.10.2020

Jeff and Colton on top of Pink Mountain, BC.

Tundra Environmental & Geotechnical Drilling 09.09.2020

217 up by Pink Mountain, BC doing some 3 DTH to install a monitor well to 40.

Tundra Environmental & Geotechnical Drilling 07.09.2020

Had a little visitor on the rig this morning.

Tundra Environmental & Geotechnical Drilling 30.08.2020

When you cant go to the beach, just make your own! 85 of sand/water and some gravel.

Tundra Environmental & Geotechnical Drilling 25.08.2020

The crew on 214 setting Odex casing into bedrock. Should hit bedrock at 60 then HQ core to 215.

Tundra Environmental & Geotechnical Drilling 17.08.2020

Happy Mothers Day to our 2 ladies on the Tundra Team ! We hope all you moms had a great day

Tundra Environmental & Geotechnical Drilling 29.07.2020

Unit 214 and support track ready to setup on a 65m hole tomorrow near Whitecourt.

Tundra Environmental & Geotechnical Drilling 24.07.2020

Tundra is still operational going through this uncertain time. We have put together certain measures as well as these small bottles of hand sanitizer for the guys out in the field to stay safe. Hopefully things will go back to normal soon but in the mean time stay safe and enjoy this extra time with your family. Happy Easter from all of us at Tundra!

Tundra Environmental & Geotechnical Drilling 13.07.2020

Beauty day up in Fort St. John, BC.

Tundra Environmental & Geotechnical Drilling 29.06.2020

Rigs 216 and 19 out doing some environmental drilling.

Tundra Environmental & Geotechnical Drilling 10.06.2020

Unit 217 back up in FSJ.

Tundra Environmental & Geotechnical Drilling 25.05.2020

217 working hard up in Fort St. John.

Tundra Environmental & Geotechnical Drilling 21.05.2020

Ernie and Logan on unit 214 drilling with HQ3 coring system to ~150.

Tundra Environmental & Geotechnical Drilling 05.05.2020

What a beauty of an Alberta view just some of the scenery the crews get to witness.

Tundra Environmental & Geotechnical Drilling 25.04.2020

Crew on Rig 19 working into the sun set yesterday.

Tundra Environmental & Geotechnical Drilling 09.04.2020

217 using Odex and DTH to get SPT samples.

Tundra Environmental & Geotechnical Drilling 29.03.2020

Tundras new hard hat sticker!

Tundra Environmental & Geotechnical Drilling 22.03.2020

Rig 19 working along side Hwy 881 near Conklin

Tundra Environmental & Geotechnical Drilling 12.03.2020

Tundra has concrete coring equipment available for any jobs that may require boreholes underneath a concrete slab.

Tundra Environmental & Geotechnical Drilling 15.02.2020

We hope everyone has a great long weekend and play safe !

Tundra Environmental & Geotechnical Drilling 02.02.2020

Unit 217 installing grounding rods using Odex as the drilling method.

Tundra Environmental & Geotechnical Drilling 18.01.2020

This warm weather doesnt stop unit 214 from getting to BH locations.

Tundra Environmental & Geotechnical Drilling 16.01.2020

Unit 209 out drilling on this beauty of a day. This unit is the perfect rig for shallow environment jobs. Its quick setup and mob from BH to BH will get the job done fast.

Tundra Environmental & Geotechnical Drilling 06.01.2020

R216 up north this week

Tundra Environmental & Geotechnical Drilling 04.01.2020

Some of the guys hard at work this week

Tundra Environmental & Geotechnical Drilling 17.12.2019

Hey Everyone ! Thanks for liking the new Tundra Page ! As things get moving more photos and videos will be posted

Tundra Environmental & Geotechnical Drilling 14.12.2019

Unit 216 - CME55 on a Morooka 800